Planning the works
Reading Time: < 1 minute
One essential part of all construction projects is the preliminary planning for the works. Before work begins, SATO’s technical team advises the works team about the best manufacturing procedures and the best ways to store, transport and place Cubipod. The collaboration involves designing the block production and storage yard, giving advice on handling and transportation methods, and determining which concrete to use during the manufacturing process.
As part of this collaboration, SATO prepares the drawings for the molds and the clamps for handling Cubipod, as well as the grids for placing it on the slope.